The installation method of the loading and unloading rack mainly includes the following steps:
Design calculation and special construction plan: Firstly, the unloading platform should undergo design calculation and prepare a special construction plan to ensure the safety and stability of the platform.
Erection and Support System: The unloading platform should have an independent support system and must not be connected to scaffolding, formwork, vertical transportation machinery, etc. The platform should be laid with wooden boards with a thickness of over 40mm and equipped with anti slip strips.
Pre embedding and tying: The external scaffolding lifting and unloading platform should be standardized and tooled, and reliably tied with four matching steel wire ropes and pre embedded steel reinforcement lifting rings to form a self-contained stress system. The pre embedded steel lifting ring should ensure the anchorage length, and the concrete strength should reach 100%.
Lifting and positioning: The unloading platform is lifted by a tower crane and can only be lifted after passing the acceptance inspection. When lifting, first hang the hooks at the four corners, slightly lift the platform, and wait until the diagonal steel wire rope is loosened before officially lifting. After hoisting to the preset position, adjust the length of the wire rope to the proper position, and then tighten the nut and wire rope clamp 3.
Protection and Load Limitation: The unloading platform must be equipped with load limitation signs and safety warning signs, and the edges should be adequately protected. During the use of the platform, both sides and the front should be vertically enclosed with templates to prevent debris from falling.
Acceptance and use: The unloading platform can only be used after it has been installed and passed the acceptance inspection. It is required to increase the acceptance inspection once. The weight limit sign should be hung in a prominent position near the platform.